Heat alarm
The Technical Handbook – Domestic, published by Scottish Ministers to provide guidance on the Scottish Building Standards suggests there are 4 main types of fire detector used in dwellings:
- Optical smoke alarms.
- Ionisation smoke alarms.
- Multi sensor alarms.
- Heat alarms.
It is important that the right type of detector is used for different situations, as false alarms can result in occupants disabling fire detection and fire alarm systems.
The most common causes of false alarms are:
Heat alarms have fixed-temperature elements and respond to the temperature of the fire gases in the immediate vicinity of the heat alarm. They are used where ambient temperatures are likely to fluctuate rapidly over a short period, such as in kitchens, and are less likely to produce false alarms. Elsewhere, heat alarms should not be used instead of smoke alarms to reduce unwanted false alarms.
The Scottish Building Standards require that at least 1 heat alarm is installed in every kitchen.
Heat alarms should conform to BS 5446: Part 2: 2003 Fire detection and fire alarm devices for dwellings. Specification for heat alarms.
[edit] Related articles on Designing Buildings Wiki
- Carbon monoxide.
- Carbon monoxide detector.
- Fire and rescue service.
- Fire dampers.
- Fire detection and alarm system.
- Fire detector.
- Fire.
- Intruder alarm.
- Ionisation smoke alarms.
- Multi-sensor alarm.
- New requirements for fire detection and alarm network systems IP 12 13.
- Optical smoke alarm.
- Over £1 billion lost every year due to false alarms.
- Smoke detector.
- The causes of false fire alarms in buildings.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.